Beyond Fossil Fuels

Spanish energy company Endesa closes 1160 MW Litoral coal plant

Placeholder image

AUTHOR: admin

PUBLISHED:

Spanish energy company Endesa has closed its 1160MW Litoral plant in Almeria. The company plans to construct 1.5 GW of renewable power (mainly solar) to replace the plant, creating more than 2,000 jobs during construction and 400 in operational and maintenance roles thereafter. 

Spanish energy company Endesa has closed its 1160MW Litoral plant in Almeria. The company plans to construct 1.5 GW of renewable power (mainly solar) to replace the plant, creating more than 2,000 jobs during construction and 400 in operational and maintenance roles thereafter. 

A renewable future:

A fair, secure, renewables-based energy system, free from fossil fuels by 2035. A clean and flexible power system will deliver lasting benefits for people, the climate, and the economy.